LEWPP I & II

The LEWPP 1 & 2 Projects were undertaken for a series of unmanned wellhead platforms, with the primary scope involving comprehensive surface preparation and protective painting works from the Helideck level down to -1 meter Mean Sea Level (MSL). A total of nine platforms were covered under this campaign. Of these, six platforms—NP, II, SK, WB, HE, and HS—were serviced using the Workboat “Goodman”, which was mobilized and operated by AJR. The remaining three platforms—NR, SU, and IJ—were accessed and executed using the Accommodation Work Barge “JT Odyssey”, provided by AFCONS.

The project demanded strict adherence to offshore surface treatment protocols and coating specifications, including standards such as SSPC/NACE for surface preparation and the application of marine-grade, high-performance coating systems suitable for atmospheric and splash zone environments. Execution was carried out in live offshore conditions, requiring seamless coordination, effective marine logistics, and rigorous compliance with safety and quality standards throughout the duration of the campaign