2024 - Life Extension of Wellhead Platform Project 2 (LEWPP 2)

Client – ONGC

Main contractor – Afcons Oil & Gas BU

Sub-Contractor – AJR

Project Start – Oct-2024 – Project Finish – May-2025

Scope –  Project Management and execution of maintenance painting of 9 Nos. Unmanned Well Platforms in Western Offshore field.  The salient scope of work are Surveys,  Procurement of Materials other than paint, Paint application including mobilization and provision of workboat including operation and management required for execution of the Project.

2024 - Yard Development & Approval

Client – Swan Energy

Contractor – AJR

Project Start – Apr-2024 – Project FinishOngoing

Scope – Survey with Third party for certification, Identification of deficiencies, mitigation plan, assistance in procurement of all capital items for development of Yard and approval by ONGC

2024 - 2 Clamp-on Project Group B

Client – ONGC

Main contractor – Das Offshore

Sub-Contractor – AJR

Project Start – Mar-2024  Project Finish –  Nov-2024 

Scope – The Project executed by AJR on back to back EPC lump sum Price basis, which includes,

  • Project Management,
  • Engineering,
  • Procurement,
  • Fabrication,
  • Loadout,
  • Topside Modification/Installation
Involved in Western Offshore Clamp on Project which includes deck extension, Subsea clamping of Three (3) new Conductors 1.5 meter above Main deck till mudline at each offshore platforms in Mumbai High North Field and Neelam – Heera Asset. In addition, modification works such as deck extension at topside with strengthening of existing structures, new installation of grating, handrails, plates, structural steel, and CP system with under water clamps for D-frame and Conductor Protectors.

2023 - Western Offshore Clamp-on Project Group A (WOCP-A) of M/s. DAS Offshore Limited

Client – ONGC

Main contractor – Das Offshore

Sub-Contractor – AJR

Project Start – Dec-2023  Project Finish – May-2024

Scope –

The Project executed by AJR on back to back EPC lump sum Price basis, which includes,

  • Project Management,
  • Engineering,
  • Procurement,
  • Fabrication,
  • Loadout,
  • Topside Modification/Installation

Involved in Western Offshore Clamp on Project which inter alia includes deck extension, Subsea clamping of Three (3) new Conductors 1.5 meter above Main deck till mudline at each offshore platforms in Mumbai High North & South Fields. In addition, modification works such as deck extension at topside with strengthening of existing structures, new installation of grating, handrails, plates, structural steel, and CP system with under water clamps for D-frame and Conductor Protectors.

2023 - PMC works of M/s. DAS Offshore Limited for Sun Petro- Cylindrical Jackup Barge, Ravi Kiran.

Client – Sun Petrochemicals Pvt. Ltd.

Contractor – Das Offshore

PMC – AJR

Project Start – May-2023  Project Finish – May-2025 

Scope – Project Management Consultancy (PMC) for Fabrication of the Cylindrical Jackup Barge. The scope involved PMC for all the following activities:

  • Engineering
  • Procurement
  • Fabrication

Specification of the Cylindrical Jackup Barge –

  • Barge Diameter – 45 Mtrs.
  • Barge Height –    4.5 Mtrs.
  • Barge Legs – 1.5mtr diameter x 45mtr length x 4 Nos
  • Structural Weight of the Barge – 1500 MT

Major equipment on the Cylindrical Jackup Barge –

  • Hydraulic Jacking System and Control Room
  • Diesel Generator – 350 Kva
  • Crawler Crane – 150 T
  • STP Plant
  • Anchor Winches & Anchors
  • Accommodation Containers

2023 - PMC works of M/s. DAS Offshore Limited for Sun Petro BD BRAVO Well Head Platform Fabrication

Client – Sun Petro

Contractor – DAS Offshore

PMC – AJR

Project Start – Mar-2023 – Project Finish – May-2025

Scope – Project Management of one platform BD Bravo for Gulf of Kutch including

  • Design & Engineering,
  • Procurement including Structures, Piping, Mechanical and E&I for Topside Decks
  • Fabrication & Erection of 2200 Metric Tons including Jacket, Piles, Deck etc. 

2021 - Protective Coating of Wellhead Platform Project – III (PCWPP-III)

Client – ONGC

Contractor – DAS Offshore & GCC Consortium

PMC – AJR

Project Start – Sep- 2021 – Project FinishOngoing

Scope –

  • Project Management for execution of Surveys (Pre-Engineering, Pre-Construction/ Pre-Installation and Post Installation), Design and Engineering, Procurement of Materials, Fabrication, Transportation, dismantling/removal and disposal of damaged materials, Offshore installation and Maintenance painting of 46 wellhead platforms of MH and N&H Assets.
  • Identification, Tech evaluation, finalization of CPA, operation and management of requiredmarine spread.

NLM-6 Platform after painting

B 134-A Platform (Before)
B-134A Platform (After)
WN-1 Platform after painting

2019 - Cluster 8 & Heera Redevelopment Project III

Client – ONGC

Main contractor – L&T Hydrocarbon Engineering (LTHE)

Sub-Contractor – Das Offshore

PMC – AJR

Project Start – Dec- 2019 – Project Finish – May-2021

Scope – Project Management for Execution of

  • Clamp on Related modification at B192-1
  • Brown Field modifications at B192-5 Platform, FPSO and ICP Complex.
  • Green Field Hook-Up at WO24-3, D30-2, B192-10 and B192-5A.
  • Hook-up with B192-5 to B192-5A Bridge.
  • Brownfield modifications at HG, HZ, HX, HY, HV, HJ and HQ
  • Green Field Hook-Up at HM, HN and HM-HG Bridge

PF

2019 - KG-DWN 98/2 Project of AFCONS/ONGC

Client – ONGC

Contractor – AFCONS

Subcontractor – Das Offshore

PMC – AJR

Project Start – Mar- 2019 – Project Finish – Mar-2021 (Phase 1- Jacket & Piles)  / Mar-2023 (Phase 2 – Bridges, Deck & Boom)

Scope – Project Management for Execution of Fabrication of Flare platform

  • Jacket 2200 MT,
  • Piles 4500 MT
  • CPP-LQUP Bridge,
  • CPP-Flare Bridge,
  • Flare Boom/Deck
Including Load out and Sea fastening on Barge as per ONGC specifications.

Assembly of CPP LQUP Bridge

Sail out of Jacket & Piles

Flare Jacket

2019 - Sikka Ports & Terminal Limited (SPTL)

Client – Reliance Industries Limited

Main contractor – Sapura Engineering and Construction Pvt. Ltd.

Sub – Contractor: Das Offshore

PMC – AJR

Project Start – Oct-2019 – Project Finish – Jan-2022

Scope – Project Management & Execution of

  • Installation and commissioning of J3 Berth A2 (J3A2) Project
  • Brownfield modifications for existing facilities, deck extensions, Pre commissioning
  • New facilities hook up piping, E&I
  • Installation of BVRU Package
  • Gangway tower
  • 3 nos unloading arms at Berth A2

Loading arm and telescopic crane installation

2019 - Life Extension of Wellhead Platform Project 1 (LEWPP 1)

Client – ONGC

Main contractor – Afcons Oil & Gas BU

Sub-Contractor – Das Offshore (DOL)

PMC – AJR

Project Start – Aug- 2019 – Project Finish – May-2025

Scope – Project Management & Execution of

  1. Topside Revamp at II,SD,N7,SU platform with 45000 inch dia at Onshore and 11000 inch dia at offshore
  2. Structure repair at Jacket Level, Boat Landing Level & Spider Deck level
  3. Deck extensions
  4. Helideck /Structure strengthening & Replacement with Aluminum Helideck
  5. Painting of entire platforms.                                     

SD Platfrom MHS

2019 - Tapti Decommissioning work

Client – Shell

Contractor – Boskalis

Sub-Contractor – AJR

Project Start – Jan- 2019 – Project Finish – Mar-2022

Scope – Provision of Project Management Key Personnel for Decommissioning of Well head Platforms MTA, STA, STB, STC, STD including pipeline removal, topside and jacket removal, demolition of removed structures at Disposal yard onshore Project.

2017 - Balance work for PRP 4

Client – ONGC

Contractor – Das Offshore

PMC – AJR

Project Start – Nov- 2017 – Project Finish – Jan-2019

Scope – Project Management for Execution of

  • Hook of new pipelines and related topside modification works for 31 platforms
  • Fabrication of deck extensions and piping spools for topside modifications.
  • Riser demolition and associated topside facilities- 53 nos
  • Identification, Tech evaluation, finalization of CPA, operation and management of required marine spread.

2017 - T & I Daman Development

Client – ONGC

Contractor – Das Offshore

PMC – AJR 

Project Start – Nov- 2017 – Project Finish – Jan-2019

Scope – Project Management for Execution of

  • Topside Modification works at TCPP/TPP Platform consist of piping, E&I , structural deck extension fabrication and installation.
  • Hook up of new well head platforms (5 Nos)
  • Fabrication and installation of helideck by stick built method at TCPP Platform
  • Identification, Tech evaluation, finalization of CPA , operation and management of required marine spread.

2017 - T&I Balance Topside Work for C26 Pipeline Project

Client – ONGC

Contractor – Das Offshore

PMC – AJR 

Project Start – Feb- 2017 – Project Finish – May-2017

Scope –  Project Management, Surveys, (pre-engineering, preconstruction, Post installation, ) Engineering , Procurement, Fabrication, load out, Tie down, sea fastening, tow out/sail out, Transportation, Installation, Hook up, testing, Pre commissioning, and start up.

Identification, Tech evaluation, finalization of CPA, operation and management of required marine spread for topside modification works at TCPP, C24P1, C39PA, C39P1,BA & BB platform.