Client – ONGC
Main contractor – Afcons Oil & Gas BU
Sub-Contractor – AJR
Project Start – Oct-2024 – Project Finish – May-2025
Scope – Project Management and execution of maintenance painting of 9 Nos. Unmanned Well Platforms in Western Offshore field. The salient scope of work are Surveys, Procurement of Materials other than paint, Paint application including mobilization and provision of workboat including operation and management required for execution of the Project.
Client – Swan Energy
Contractor – AJR
Project Start – Apr-2024 – Project Finish – Ongoing
Scope – Survey with Third party for certification, Identification of deficiencies, mitigation plan, assistance in procurement of all capital items for development of Yard and approval by ONGC
Client – ONGC
Main contractor – Das Offshore
Sub-Contractor – AJR
Project Start – Mar-2024 Project Finish – Nov-2024
Scope – The Project executed by AJR on back to back EPC lump sum Price basis, which includes,
Client – ONGC
Main contractor – Das Offshore
Sub-Contractor – AJR
Project Start – Dec-2023 Project Finish – May-2024
Scope –
The Project executed by AJR on back to back EPC lump sum Price basis, which includes,
Involved in Western Offshore Clamp on Project which inter alia includes deck extension, Subsea clamping of Three (3) new Conductors 1.5 meter above Main deck till mudline at each offshore platforms in Mumbai High North & South Fields. In addition, modification works such as deck extension at topside with strengthening of existing structures, new installation of grating, handrails, plates, structural steel, and CP system with under water clamps for D-frame and Conductor Protectors.
Client – Sun Petrochemicals Pvt. Ltd.
Contractor – Das Offshore
PMC – AJR
Project Start – May-2023 Project Finish – May-2025
Scope – Project Management Consultancy (PMC) for Fabrication of the Cylindrical Jackup Barge. The scope involved PMC for all the following activities:
Specification of the Cylindrical Jackup Barge –
Major equipment on the Cylindrical Jackup Barge –
Client – Sun Petro
Contractor – DAS Offshore
PMC – AJR
Project Start – Mar-2023 – Project Finish – May-2025
Scope – Project Management of one platform BD Bravo for Gulf of Kutch including
Client – ONGC
Contractor – DAS Offshore & GCC Consortium
PMC – AJR
Project Start – Sep- 2021 – Project Finish – Ongoing
Scope –
NLM-6 Platform after painting
Client – ONGC
Main contractor – L&T Hydrocarbon Engineering (LTHE)
Sub-Contractor – Das Offshore
PMC – AJR
Project Start – Dec- 2019 – Project Finish – May-2021
Scope – Project Management for Execution of
PF
Client – ONGC
Contractor – AFCONS
Subcontractor – Das Offshore
PMC – AJR
Project Start – Mar- 2019 – Project Finish – Mar-2021 (Phase 1- Jacket & Piles) / Mar-2023 (Phase 2 – Bridges, Deck & Boom)
Scope – Project Management for Execution of Fabrication of Flare platform
Assembly of CPP LQUP Bridge
Sail out of Jacket & Piles
Flare Jacket
Client – Reliance Industries Limited
Main contractor – Sapura Engineering and Construction Pvt. Ltd.
Sub – Contractor: Das Offshore
PMC – AJR
Project Start – Oct-2019 – Project Finish – Jan-2022
Scope – Project Management & Execution of
Loading arm and telescopic crane installation
Client – ONGC
Main contractor – Afcons Oil & Gas BU
Sub-Contractor – Das Offshore (DOL)
PMC – AJR
Project Start – Aug- 2019 – Project Finish – May-2025
Scope – Project Management & Execution of
SD Platfrom MHS
Client – Shell
Contractor – Boskalis
Sub-Contractor – AJR
Project Start – Jan- 2019 – Project Finish – Mar-2022
Scope – Provision of Project Management Key Personnel for Decommissioning of Well head Platforms MTA, STA, STB, STC, STD including pipeline removal, topside and jacket removal, demolition of removed structures at Disposal yard onshore Project.
Client – ONGC
Contractor – Das Offshore
PMC – AJR
Project Start – Nov- 2017 – Project Finish – Jan-2019
Scope – Project Management for Execution of
Client – ONGC
Contractor – Das Offshore
PMC – AJR
Project Start – Nov- 2017 – Project Finish – Jan-2019
Scope – Project Management for Execution of
Client – ONGC
Contractor – Das Offshore
PMC – AJR
Project Start – Feb- 2017 – Project Finish – May-2017
Scope – Project Management, Surveys, (pre-engineering, preconstruction, Post installation, ) Engineering , Procurement, Fabrication, load out, Tie down, sea fastening, tow out/sail out, Transportation, Installation, Hook up, testing, Pre commissioning, and start up.
Identification, Tech evaluation, finalization of CPA, operation and management of required marine spread for topside modification works at TCPP, C24P1, C39PA, C39P1,BA & BB platform.